
Join the ETIP HYDROPOWER general assembly to receive news about our activities, events and research & innovation in hydropower opportunities.
Join Us
The Swiss Federal Government oversees the construction and modification of large water retaining facilities (WRFA, SR 721.101). Any changes to these facilities, including dams, reservoirs, and safety-relevant auxiliary installations, require planning approval to ensure technical safety (WRFA art. 6). This extends to modifications from appurtenant installations like floating photovoltaic platforms, heliports, wind turbines, etc. The Swiss Federal Office of Energy (SFOE), specifically its Dam Supervision Section (TS), is responsible for the technical safety assessment of large dams.
The SFOE is calling for expert applications to develop a directive (Part F) on the safety of water retaining facilities with appurtenant installations. This directive will outline the minimum safety recommendations needed. The working group will draft the directive in three phases:
Experts are sought in areas such as anchoring, dam design, floating structures, geology, instrumentation, civil engineering, meteorology, natural hazards, and risk management. The working group will include 10-15 experts and involve three face-to-face sessions, three online sessions, and eleven and a half days of work, totaling sixteen days by March 2026.
Applications, including CVs and fixed daily rates, must be submitted by June 30, 2024, to Thomas Menouillard at the SFOE.
Contact:
Thomas Menouillard
Swiss Federal Office of Energy, SFOE
Pulverstrasse 13, 3063 Ittigen
Email: thomas.menouillard@bfe.admin.ch
Read more about the application by clicking here
Contact Us about this item.